Key Highlights
- A localised ceasefire has been agreed by Russia and Ukraine.
- Repairs on the 330 kV backup power line at ZNPP are set to begin soon.
- The backup line was damaged and disconnected on January 2 due to military activity.
- Currently, ZNPP relies on a single functioning 750 kV main power line.
- An IAEA team has been dispatched to observe the repair process.

