Indian Clarity

Light. Truth. Clarity.

Loading ad...
Technology

Work to lay concrete for two new Kaiga units launched

Published - March 01, 2026 08:08 pm IST - Belagavi A view of the Kaiga atomic power station in Karwar where concreting work for two new units began on Sunday. | Photo Credit: SPECIAL ARRANGEMENT Atomic Energy Commission Chairman Ajit Kumar Mohanty launched concreting work for the construction of the fifth and sixth nuclear power units at Kaiga in Uttara Kannada on Sunday. He said that 10 units of indigenous technology PHW (Pressurised Heavy Water) reactor type are being built at various nuclear power plants in the country.

Work to lay concrete for two new Kaiga units launched

Credit: Thehindu

Key Highlights

  • Out of these, two units of 700 MW capacity of PHW type are being built at Kaiga.
  • With this technology, the PHW used once in the reactor will be re-used several times.
  • These two units are being built at a cost of around ₹21,000 crore.
  • Dr.
  • Mohanty launched the work by pressing a button.
Loading ad...

Sources

  1. Work to lay concrete for two new Kaiga units launched

This quick summary is automatically generated using AI based on reports from multiple news sources. The content has not been reviewed or verified by humans. For complete details, accuracy, and context, please refer to the original published articles.

Related Stories

Loading ad...